The Columbia County Flood of 2007

 

 

1.  CASH FOR COLUMBIA COUNTY FLOOD RELIEF FUND thru WAUNA FEDERAL CREDIT UNION OR US BANK

2.   VOLUNTEERS

3.  Power Tools; these will be available to all flood victims on a loan basis thru our distribution center

4.  Building Supplies

5.  Appliances, 5 years or newer, in good working order

 

GRAVEL!  ¾ Minus, 1-1/2, Base Rock, Pit Run Gravel

Hay & Grain


CARS AND PICKUPS

 

BUILDING SUPPLIES:

Insulation (2x4x15 R-15, 2x4x23 R-21, and various other sizes tbd)

[One of our marketing aspects we've been pushing is that a 1000 square foot home will cost approximately $185.00-$200.00 to replace the flood-damaged insulation (outside walls only )

Underlayment (1/4" )

Plywood (1/2" )

3-1/4" prepainted base tri m

2-1/4” casing trim, 7’ lengths, 700 linear feet tota l

Drywall & Texturing Mu d

Drywall paper tap e

Buckets of Drywall Screws 1-1/2" and 1-5/8 "

12 and 14 gauge Romax Wir e

Interior Doors: 28”, 30",  32" (all prehung )

18 gauge 1” x ¼” crown staples (for air stapler )

18 gauge 2” brads (for air nailer )

Door knobs (privacy and passage )

Light colored (white or antique white –latex interior paint, satin or eggshell )

White outlets and coverplates

 

 
This page is Hosted and Maintained as a free service to Vernonia residents and volunteers by:
Site Designs North West